
Commercial Water Well Drilling
Casey Jones Well Drilling handles commercial water well drilling in Eugene, OR and the surrounding counties: irrigation wells, groundwater monitoring wells and geotechnical holes.

Casey Jones Well Drilling provides elevator jack hole drilling in Eugene, OR for general contractors, elevator installers and building owners who need a clean, accurate hole for a hydraulic cylinder. Call (541) 747-2806.
An in-ground hydraulic elevator needs a hole below the pit, and that hole has to be right the first time. A single stage jack goes into the ground about as far as the elevator travels, so the hole is deep and narrow, and it is often drilled in a space the building has already started to close in around.
Each of these is a groundwater or geology problem as much as a construction one, which is why the work suits a well driller. Our crews deal with changing formations, water and casing on every well we drill.

Jack hole work runs on the general contractor's schedule. Every step of our elevator jack hole drilling in Eugene, OR is planned around the pit, the pour and the elevator installer.
We review the elevator layout, the required hole depth and diameter, and any soils information for the site. Where we can, we walk the site with your superintendent before the rig arrives.
The rig is set over the hole location in coordination with your crew and the elevator company. Access, overhead clearance and the condition of the pit are checked before drilling starts.
The hole is drilled to the specified depth and diameter, with casing set where the ground needs support. We watch the cuttings and any water as we go, so a change in the formation does not become a surprise.
We confirm the finished depth with your team before the rig leaves. The hole is then ready for the elevator company to set the liner and cylinder to the manufacturer's requirements.
On a new building, the hydraulic elevator jack hole is drilled once the pit location is set. It has to match the elevator plans exactly. Elevator makers place a PVC liner around in-ground cylinders to protect them from rust and to keep oil out of the soil, so the hole must leave room for the liner as well as the cylinder.
Depth matters just as much. A single stage jack goes into the ground about as far as the elevator travels, and a short hole cannot be fixed later. We drill to the depth the plans call for and keep the hole plumb from top to bottom. The installer can then set the cylinder without fighting the hole.
We have drilled elevator jack holes for major construction firms, and we know a jack hole is one line on a long schedule. Clear communication with your superintendent and the elevator company keeps the pit work moving.

Many older hydraulic elevators use traditional in-ground jacks that are at risk from rust. A new jack may come with a liner that needs a larger hole than the old one. In other cases the old hole must be cleaned out and drilled again. Elevator hole drilling for a replacement is a different job from new work, because the building is finished and in use.
A working building has its own limits: tight access, finished floors around the pit and tenants who still need the space. We plan rig access and the work area with the owner and the elevator contractor before the old jack comes out. That keeps the outage as short as the job allows.

Jack holes are quoted per project from the plans and the site conditions, and per-foot drilling costs move with the price of materials. The main factors are:
Send the elevator plans, any soils report and the schedule early. That gives you the most accurate estimate for elevator jack hole drilling in Eugene, OR and the fewest changes once the rig is on site.

Casey Jones Well Drilling has drilled more than 10,000 wells in Oregon since 1947. Rotary drilling equipment lets us drill through hard rock, and our crews read changing formations every working day. That background carries straight into jack hole work, where rock, water and caving ground are the usual obstacles.
We are a fourth generation, family owned and operated company, registered with the Oregon Construction Contractors Board as CCB #114437, and we have worked with major construction firms on elevator jack holes. The family name has stood for honesty and hard work in this area for generations, and we tell you the truth about the ground before the rig arrives.
Jack hole work is one of our well drilling services. The same crews handle commercial water well drilling and geothermal drilling for heat pump systems.

Commercial building in our region runs from the Eugene and Springfield area to Corvallis in the Willamette Valley and out to the Lincoln County coast. Ground conditions change across that distance, and so does site access, from open lots on the edge of town to tight urban sites with little room for a rig.
We take jack hole projects in Lane, Lincoln and Benton Counties. We also work in nearby areas within about 80 miles of our base in Pleasant Hill. Elevator jack hole drilling in Eugene, OR is close to home for us, and a site farther out is worth a call too. Send the address and the schedule for anything near the edge of our well drilling service area, and we will tell you plainly whether we can take the job.

Casey Jones Well Drilling handles commercial water well drilling in Eugene, OR and the surrounding counties: irrigation wells, groundwater monitoring wells and geotechnical holes.

Casey Jones Well Drilling provides geothermal drilling in Eugene, OR and nearby counties, drilling the holes that open and closed loop heat pump systems need.

Casey Jones Well Drilling offers well cleaning in Eugene, OR and throughout Lane County, clearing sediment, slime and mineral buildup from wells that have started to clog.

For a single stage in-ground hydraulic jack, the hole extends into the ground about the same distance as the elevator travels, plus whatever the manufacturer's design requires below the pit. The elevator company's plans set the final depth and diameter, and we drill to those numbers. Sharing the plans early lets us check the depth against the expected ground conditions.
Elevator manufacturers use a PVC liner between the cylinder and the soil to protect the cylinder from galvanic and electrolytic corrosion and to keep hydraulic oil from leaking into the ground. The hole has to be drilled large enough for that liner. We confirm the liner size with the elevator company and size the hole to suit it.
Groundwater and rock are everyday conditions for a well driller. Rock is drilled with rotary equipment, and water bearing or caving layers are held back with casing so the hole stays open. If conditions differ from what the plans assumed, we tell your superintendent right away so the schedule and budget can be adjusted.
In many cases, yes. A replacement jack with a corrosion resistant liner may need a larger hole than the original, or the old hole may need cleaning out and redrilling. We look at the existing hole, the old casing and the access inside the building, then quote the work so the owner and the elevator company can plan the outage.
Yes. We have drilled elevator jack holes for major construction firms and coordinate site access, timing and the finished depth with the superintendent and the elevator installer. Building owners planning a cylinder replacement are welcome to call us directly, and we can work alongside the elevator company they have chosen.
Send us the elevator plans and the project schedule, and we will review the hole, the ground and the access with you. Call (541) 747-2806, Monday to Friday, 8:00 AM to 4:00 PM, or ask for a free estimate.
Please enter your name.
Please enter your email.
Enter a valid email address.
Please tell us a bit about your needs.
Enter a 10-digit phone number.
Please fix the highlighted fields and try again.
Sending...
Something went wrong. Please try again or call us.
This form is not connected yet. Please call us instead.
Too many attempts just now. Please try again in a minute.
That file is too large. Please attach a smaller one, or send it by email.
Something went wrong sending your message. Please try again.
Could not reach the server. Please check your connection and try again.
Spam check