Monday to Friday, 8:00 AM to 4:00 PM CCB #114437 Lane, Lincoln and Benton Counties
For Contractors and Builders

Elevator Jack Hole Drilling in Eugene, OR for Commercial Projects

Casey Jones Well Drilling provides elevator jack hole drilling in Eugene, OR for general contractors, elevator installers and building owners who need a clean, accurate hole for a hydraulic cylinder. Call (541) 747-2806.

Common Jack Hole Problems on a Building Site

An in-ground hydraulic elevator needs a hole below the pit, and that hole has to be right the first time. A single stage jack goes into the ground about as far as the elevator travels, so the hole is deep and narrow, and it is often drilled in a space the building has already started to close in around.

  • Hard rock or cobbles that stall ordinary foundation drilling equipment
  • Water bearing layers that flood the hole as it deepens
  • Loose sand or gravel that caves in before casing is set
  • Tight access inside a pit or a partly framed building
  • An existing jack hole too narrow or too shallow for a new cylinder

Each of these is a groundwater or geology problem as much as a construction one, which is why the work suits a well driller. Our crews deal with changing formations, water and casing on every well we drill.

Hydraulic cylinders rusty drill pipe yellow rig close up oregon
What to Expect

Our Jack Hole Drilling Process

Jack hole work runs on the general contractor's schedule. Every step of our elevator jack hole drilling in Eugene, OR is planned around the pit, the pour and the elevator installer.

  1. Plans and Site Review

    We review the elevator layout, the required hole depth and diameter, and any soils information for the site. Where we can, we walk the site with your superintendent before the rig arrives.

  2. Rig Setup at the Pit

    The rig is set over the hole location in coordination with your crew and the elevator company. Access, overhead clearance and the condition of the pit are checked before drilling starts.

  3. Drilling and Casing

    The hole is drilled to the specified depth and diameter, with casing set where the ground needs support. We watch the cuttings and any water as we go, so a change in the formation does not become a surprise.

  4. Handoff to the Elevator Installer

    We confirm the finished depth with your team before the rig leaves. The hole is then ready for the elevator company to set the liner and cylinder to the manufacturer's requirements.

Hydraulic Elevator Jack Hole Drilling for New Construction

On a new building, the hydraulic elevator jack hole is drilled once the pit location is set. It has to match the elevator plans exactly. Elevator makers place a PVC liner around in-ground cylinders to protect them from rust and to keep oil out of the soil, so the hole must leave room for the liner as well as the cylinder.

Depth matters just as much. A single stage jack goes into the ground about as far as the elevator travels, and a short hole cannot be fixed later. We drill to the depth the plans call for and keep the hole plumb from top to bottom. The installer can then set the cylinder without fighting the hole.

We have drilled elevator jack holes for major construction firms, and we know a jack hole is one line on a long schedule. Clear communication with your superintendent and the elevator company keeps the pit work moving.

Low angle portable drill rig muddy site oregon

Elevator Hole Drilling for Jack Replacement

Many older hydraulic elevators use traditional in-ground jacks that are at risk from rust. A new jack may come with a liner that needs a larger hole than the old one. In other cases the old hole must be cleaned out and drilled again. Elevator hole drilling for a replacement is a different job from new work, because the building is finished and in use.

A working building has its own limits: tight access, finished floors around the pit and tenants who still need the space. We plan rig access and the work area with the owner and the elevator contractor before the old jack comes out. That keeps the outage as short as the job allows.

Red tracked drill rig hydraulic hoses excavated pit rusty pipe

What Affects the Cost of Elevator Jack Hole Drilling in Eugene, OR

Jack holes are quoted per project from the plans and the site conditions, and per-foot drilling costs move with the price of materials. The main factors are:

  • Required depth, which is set by the elevator's travel
  • Hole diameter for the cylinder and its liner
  • Ground conditions such as rock, cobbles, sand or groundwater
  • Casing needed to hold the hole open while drilling
  • Rig access to the pit, inside or outside the building
  • Redrilling or enlarging an existing hole for a replacement jack

Send the elevator plans, any soils report and the schedule early. That gives you the most accurate estimate for elevator jack hole drilling in Eugene, OR and the fewest changes once the rig is on site.

Blue casing oscillator clamp rusty steel casing hydraulic hoses field oregon

Why Builders Choose Us as Their Elevator Shaft Drilling Contractor

Casey Jones Well Drilling has drilled more than 10,000 wells in Oregon since 1947. Rotary drilling equipment lets us drill through hard rock, and our crews read changing formations every working day. That background carries straight into jack hole work, where rock, water and caving ground are the usual obstacles.

We are a fourth generation, family owned and operated company, registered with the Oregon Construction Contractors Board as CCB #114437, and we have worked with major construction firms on elevator jack holes. The family name has stood for honesty and hard work in this area for generations, and we tell you the truth about the ground before the rig arrives.

Jack hole work is one of our well drilling services. The same crews handle commercial water well drilling and geothermal drilling for heat pump systems.

Casey jones well drilling truck door logo worker hose jobsite

Every estimate is free.

(541) 747-2806

Jack Hole Projects in Lane, Lincoln and Benton Counties

Commercial building in our region runs from the Eugene and Springfield area to Corvallis in the Willamette Valley and out to the Lincoln County coast. Ground conditions change across that distance, and so does site access, from open lots on the edge of town to tight urban sites with little room for a rig.

We take jack hole projects in Lane, Lincoln and Benton Counties. We also work in nearby areas within about 80 miles of our base in Pleasant Hill. Elevator jack hole drilling in Eugene, OR is close to home for us, and a site farther out is worth a call too. Send the address and the schedule for anything near the edge of our well drilling service area, and we will tell you plainly whether we can take the job.

Hwy 58 5 58 126 20 Lane County Benton County Lincoln County CorvallisEugeneSpringfieldNewport Pleasant Hill Pacific Ocean About 80 miles N Schematic map, not to scale

Commercial Water Well Drilling

Casey Jones Well Drilling handles commercial water well drilling in Eugene, OR and the surrounding counties: irrigation wells, groundwater monitoring wells and geotechnical holes.

Geothermal Drilling

Casey Jones Well Drilling provides geothermal drilling in Eugene, OR and nearby counties, drilling the holes that open and closed loop heat pump systems need.

Well Cleaning

Casey Jones Well Drilling offers well cleaning in Eugene, OR and throughout Lane County, clearing sediment, slime and mineral buildup from wells that have started to clog.

A Casey Jones Well Drilling rig and crew at work on an Oregon job site

Elevator Jack Hole Questions

How deep does an elevator jack hole need to be?

For a single stage in-ground hydraulic jack, the hole extends into the ground about the same distance as the elevator travels, plus whatever the manufacturer's design requires below the pit. The elevator company's plans set the final depth and diameter, and we drill to those numbers. Sharing the plans early lets us check the depth against the expected ground conditions.

Why does a hydraulic elevator jack hole need a PVC liner?

Elevator manufacturers use a PVC liner between the cylinder and the soil to protect the cylinder from galvanic and electrolytic corrosion and to keep hydraulic oil from leaking into the ground. The hole has to be drilled large enough for that liner. We confirm the liner size with the elevator company and size the hole to suit it.

What happens if the drill hits groundwater or rock?

Groundwater and rock are everyday conditions for a well driller. Rock is drilled with rotary equipment, and water bearing or caving layers are held back with casing so the hole stays open. If conditions differ from what the plans assumed, we tell your superintendent right away so the schedule and budget can be adjusted.

Can an existing jack hole be redrilled for a new cylinder?

In many cases, yes. A replacement jack with a corrosion resistant liner may need a larger hole than the original, or the old hole may need cleaning out and redrilling. We look at the existing hole, the old casing and the access inside the building, then quote the work so the owner and the elevator company can plan the outage.

Do you work directly with general contractors?

Yes. We have drilled elevator jack holes for major construction firms and coordinate site access, timing and the finished depth with the superintendent and the elevator installer. Building owners planning a cylinder replacement are welcome to call us directly, and we can work alongside the elevator company they have chosen.

Free Estimates

Book Your Jack Hole With a Crew That Knows the Ground

Send us the elevator plans and the project schedule, and we will review the hole, the ground and the access with you. Call (541) 747-2806, Monday to Friday, 8:00 AM to 4:00 PM, or ask for a free estimate.